Surrey Bike Trail Map 2026: 198 km Open to e-Bikes, Rule by Rule

Zeus riding a Samebike VOYAGER on a gravel dyke path like Mud Bay’s: a Playcut.ai rendering made from Samebike’s own photograph of the VOYAGER, with the frame’s lettering left off.
Yes. An e-bike that meets B.C.’s test (a motor of 500 W or less in total, assistance that stops at 32 km/h, working pedals, a rider 16 or older on a standard e-bike) may ride Surrey’s roads, bike lanes and multi-use pathways, and the City says so in plain words. By our count of the City’s own data that is 198 km of multi-use path and greenway, counted once. Stay off sidewalks unless a sign allows cycling ($80 if paid within 7 days, $105 after).
In City parks, bikes and e-bikes may use only paths built for them, at 15 km/h. Metro Vancouver’s Tynehead and Surrey Bend parks read two ways for e-bikes, and Highway 1 and Highway 99 north of 8 Avenue are closed to them. For the gravel, our picks start with the Samebike VOYAGER and the Taubik Westridge 29T; for the paved greenways, see our e-bike collection.
On 25 November 2026 we read every rule at its source: the City’s parks bylaw (No. 13480, consolidated to 2023) and Highway and Traffic By-law (No. 13007, consolidated to 13 April 2026), the City’s cycling, greenway, park and e-scooter pages, Metro Vancouver’s bylaw 1420 and its 2025 staff report, its park pages in full (collapsed panels included), B.C.’s e-bike regulation, Motor Vehicle Act and highway rules (all current to 17 November 2026), and TransLink’s bike rules.
Last updated: 25 November 2026. On that date every rule, map layer and live maker page on this page was read again at its source.
The map is built from eleven City open-data layers (every layer complete: features retrieved equal the City’s own count), Metro Vancouver’s park boundaries and OpenStreetMap lines inside its parks. Overlapping lines are counted once. The questions we answer come from 912 Google and 854 Bing suggestions, our Search Console data and the answers of three AI engines. Each bike’s figures were re-read on its maker’s Canadian page the same day, except the Samebike C05 Pro’s: Samebike has removed that page, and the card cites our 9 November 2026 read.
- Can you ride an e-bike on Surrey’s trails?
- Six rides to start with
- Greenways and multi-use paths
- City parks, urban forests and bike parks
- Tynehead, Surrey Bend and the regional greenway
- Mud Bay, Blackie Spit and Serpentine Fen
- Bike lanes, sidewalks, highways and bridges
- Is it an e-bike? B.C.’s test
- SkyTrain, buses and rentals
- 19 e-bikes for Surrey’s trails
- What could change
- Every community, every named greenway
- Frequently asked questions
Can you ride an e-bike on Surrey’s trails?
Yes, on most of the network built for bikes. The City’s cycling page, updated 13 November 2026, says “E-bikes are permitted on roads, designated bike lanes, and multi-use pathways across Surrey.” A wrong turn onto a sidewalk costs $80 to $105. This map shows the 198 km that are open, the park paths to ask about and two closed highways.
Four rulebooks decide where an e-bike goes in Surrey: B.C.’s (B.C. Reg. 64/2024), the City’s two bylaws, Metro Vancouver’s for its regional parks, and the Province’s highway rules. A bike that passes B.C.’s test is a “cycle” in the City’s Highway and Traffic By-law, which says a cycle “includes a motor-assisted cycle”. That is why the City can open its paths to e-bikes in one sentence.
How to read the colours

Tap the map to open it full screen. Zoom in, tap any trail for its rule, search a trail by name, or tap Where am I at the trailhead. Green lines are open, dotted green means a City park (15 km/h), amber means two readings, blue is a bike park, grey means ask first, and red dashes mean no.
| Colour on the map | What it is | Kilometres (counted once) | The rule |
|---|---|---|---|
| Green | City multi-use paths and greenways in service | 198.2 (of which 55.7 inside City parks) | Open: the City says e-bikes are permitted; 15 km/h inside a park |
| Grey | City park paths labelled walkway, recreation, nature and similar | 267.9 | Ask first: bikes only on paths built for them, and never where signs bar them |
| Blue | City mountain-bike trails in bike parks | 8.8 | Built for bikes; the City has written no e-bike rule |
| Amber | Metro Vancouver trails open to cycling | 11.1 | Two readings for e-bikes |
| Dark grey | Metro Vancouver trails closed to cycling | 10.5 | No bikes |
| Dark grey | Trails the City calls unsanctioned | 25.1 | Stay off: not sanctioned by the City |
| Red dashes | Highway 1 and Highway 99 north of 8 Avenue | 11.9 + 13.6 | No bikes or e-bikes on the road portion |
The kilometres are our measurement of the City’s open data (Surrey Open Data, retrieved 25 November 2026), with overlapping lines counted once and lines outside the City left out. Bike lanes on streets are drawn separately: 365 km of line, or about 347 km of road once lanes on both sides of a street are counted once.
Six rides to start with
Start with the long greenways the City has finished. Four of these six are multi-use paths where the City permits e-bikes; Tynehead’s Perimeter Trail and the Delta end of the Mud Bay dyke belong to Metro Vancouver, where the rule reads two ways. The lengths are each owner’s own; tap a name to find it on the map.
| Ride | Length (its owner’s figure) | Surface and setting | E-bike rule |
|---|---|---|---|
| Green Timbers Greenway | “The 16km east-west route”, Nordel to the Golden Ears Bridge | Shared multi-use pathways along utility corridors | Open |
| BC Parkway (Surrey) | Scott Road Station to King George Station (no length printed; 4.3 km on our map) | Follows the SkyTrain Expo Line | Open |
| Bose Greenway | “The 8km east-west route”, Sullivan to Clayton | Multi-use pathways along 64 Avenue | Open |
| Fraser Heights Greenway | “The 5km east-west route”, Port Mann Bridge to Tynehead | Utility corridors and some local roads | Open; the bridge path reads two ways |
| Tynehead Perimeter Trail | About 5 km paved (east) and 1 km gravel (west) | Metro Vancouver regional park | Two readings |
| Mud Bay Dyke Trail | Joins “20 kilometres of shoreline” to Boundary Bay | Dyke along Mud Bay | Open in Surrey; two readings in the Delta regional park |
The City describes the Green Timbers, Bose and Fraser Heights greenways on its cycling page, and the BC Parkway as the route that “connects Scott Road Station to King George Station” in Surrey. Metro Vancouver gives the Tynehead figures on its park page, and the City’s Mud Bay Park page sends riders along the dyke “to follow 20 kilometres of shoreline all the way to Boundary Bay Regional Park in Delta.”
For a longer day, the City’s Fraser Heights Greenway ends at Tynehead Regional Park, and on our map the Green Timbers Greenway meets the park’s cycling trails as well, so Tynehead’s Perimeter Trail, with its two readings, links the two. Our map measures 15.6 km of the Green Timbers Greenway in service, close to the City’s 16 km.
Greenways and multi-use paths: open to e-bikes
The City’s answer: “E-bikes are permitted on roads, designated bike lanes, and multi-use pathways across Surrey.” Its cycling page files greenways under multi-use pathways and asks riders on shared paths to “keep right, pass on the left using a bell or verbal warning, and yield to pedestrians at all times.” We count 198 km of this network in service.
One older City page reads differently. The Greenways Master Plan page still says “Greenways are multi-use pathways for pedestrians, cyclists and other non-motorized users”, wording that goes back to the 2012 plan (Corporate Report R129). The City’s e-bike sentence on its cycling page is the newer and more specific one, so we follow it, and the sign at a greenway entrance governs where one is posted.
The bylaws agree with the cycling page. By-law 13007 counts an e-bike as a cycle, and its “highway” takes in every “walkway, pathway” and “any other way used by or intended for use by the public”; a cyclist on a walkway “has the same rights and duties as a pedestrian” (s. 66(1.1)). Inside a City park, the parks bylaw adds a 15 km/h limit for every vehicle, bicycles included, which covers 56 km of the green network on our map.
The network keeps growing. Council’s January 2026 cycling vision says “The Vision identifies 353 km of cycling routes across Surrey”, of which “178 km are already built” (Corporate Report R007; City cycling page). The City’s greenway layer also holds 212.6 km of greenways marked conceptual, which we leave off the map until they are built.
Built for the long greenways?
The Taubik Vista 26 and the Addmotor CityPro E-43 are listed at 500 W and 32 km/h by their makers. Call 1-866-938-7580 and tell us your route.
See every e-bike we sell →City parks, urban forests and bike parks: ask first
Inside a City park, ride only where a path is built for bikes and no sign says otherwise. The parks bylaw (By-law 13480) defines a vehicle as any conveyance “propelled by any mechanical device or other motive power whatsoever, and shall include bicycles”, so an e-bike and a pedal bike are treated alike.
- Section 66: no vehicle anywhere in a park “except upon a driveway, roadway, path, lane or parking area designed for vehicular traffic.”
- Section 67: no vehicle “where signs have been posted prohibiting such use, occupation or travel”.
- Section 68.1: “No person shall cycle on a trail or pathway in a manner or at a speed that could cause injury to other persons.”
- Section 69: “No person shall drive a vehicle within a park at a rate of speed greater than 15 kilometers per hour.”
Break them and section 71 makes “any vehicle found within a park in contravention of this By-law” subject to “seizure and removal from the park at the expense of the owner or operator of the vehicle.”
The City’s data labels 268 km of park paths and trails as walkways, recreation trails, nature trails, boardwalks or similar, which we draw in grey. The City publishes no definition of those labels, so a grey line means ask first: walk your bike unless a sign opens the path to cycling.
Urban forests and unsanctioned trails
Green Timbers has “over 10 kilometres of nature trails”, the City says (City page). On our map the parks named Green Timbers hold 15.1 km of grey paths, 3.0 km of green path, most of it the Green Timbers Greenway (15 km/h inside the park), and 6.1 km of trails the City calls unsanctioned. Redwood Park has “over 5 kilometres of scenic nature trails” (Redwood Park), and Sunnyside Acres holds most of the South Surrey Bike Park, below.
The City’s data also marks 25 km of trail as unsanctioned, 24 km of it inside City parks. The City has not sanctioned them, so our map marks them no: stay off them with any bike. E-scooters are a separate case: the City says “E-scooters are not permitted on public property”, parks included (City e-scooter page).
Bike parks
Surrey runs bike parks across the city, from the South Surrey Bike Park, “the first official bike park in Surrey”, to Invergarry, “one of the premier downhill mountain bike parks in the Lower Mainland” (South Surrey Athletic Park, Invergarry Park). The City warns that at Invergarry “some of the terrain is expert only with drops up to 3 metres.” Our map shows 8.8 km of trail the City labels mountain bike.
Most of it, 6.8 km, is the South Surrey Bike Park. The City’s trail data names those trails for the bike park, and its park layer places 5.7 km of them inside Sunnyside Acres Urban Forest Park, whose own page describes “about four kilometres” of nature trails (Sunnyside Acres).
The City’s bike-park page and the park pages we read for Invergarry, South Surrey Athletic, Cloverdale Athletic, Panorama and Port Kells do not mention e-bikes, and the parks bylaw treats an e-bike as a bicycle, so read the sign at the gate. Our picks are built for greenways and gravel, not for jump lines or downhill trails.
Tynehead, Surrey Bend and the regional greenway: two readings
Metro Vancouver runs Tynehead, Surrey Bend and the Delta-South Surrey Regional Greenway, and its rule for e-bikes reads two ways. Its bylaw allows e-bikes only where a posted notice opens an area to them, while its own 2025 staff report says e-bikes may use any trail open to cycling. Read the sign at the trailhead.
Bylaw 1420 bars anyone to “use or operate an e-bike or e-scooter except on and within a roadway or parking lot or in an area designated by posted notice as allowing that activity” (s. 29(f), consolidated to 1 January 2026), and a posted notice includes “any written sign, pictograph, notice, brochure, or map in a regional park, or on MVRD website”.
Its pages for these three, and for Boundary Bay Regional Park next door in Delta, designate cycling but do not mention e-bikes. Its staff report to the Regional Parks Committee on 2 April 2025 says “e-bikes will be permitted on any trails or greenways that are currently designated by posted notice as allowing human-powered cycles” (agenda, item E1).

North Surrey: tap the map to see Tynehead’s and Surrey Bend’s trails up close.
Tynehead Regional Park. “Cycling is only allowed on the Tynehead Perimeter Trail”, Metro Vancouver says: “Tynehead Perimeter Trail (east) is approximately 5 km of paved trail” and “Tynehead Perimeter Trail (west) is gravel and is approximately 1 km.” Its page lists 15.1 km of hiking and walking trails and 6.3 km of cycling trails (park page).
Surrey Bend Regional Park. “Cycling is not permitted on the pedestrian-only section of Parsons Trail”, and the page lists 5.3 km of cycling trails (park page). Delta-South Surrey Regional Greenway. “The greenway is open to hiking, horseback riding and cycling”, 6.6 km in all (park page).
Mud Bay, Blackie Spit and Serpentine Fen
South Surrey’s shoreline mixes three owners. The City’s Mud Bay Dyke Trail is part of its greenway network and open to e-bikes; the dyke beyond it belongs to Metro Vancouver’s Boundary Bay Regional Park in Delta; and Blackie Spit and Serpentine Fen are walks. Here is what each owner says.

South Surrey: tap the map to follow the Mud Bay Dyke Trail up close.
Mud Bay and Boundary Bay
The City’s Mud Bay Park page says “The nature trail is nearly 3 kilometres long” and points riders east along the dyke “to follow 20 kilometres of shoreline all the way to Boundary Bay Regional Park in Delta.” From Mud Bay, Metro Vancouver calls the Boundary Bay dyke “a shared trail for cycling, hiking and horseback riding” and says “Cycling is not permitted on any pedestrian-only trails” (Boundary Bay page): the same two readings for e-bikes as Tynehead.
Blackie Spit
In the Environmentally Sensitive Area on the spit, “no dogs or bikes are allowed”, the City says, and riders on foot should “stay on the central trail only” (City page). Lock up and walk.
Serpentine Fen
Serpentine Fen is a provincial wildlife management area: 71 hectares by the Province’s count, 150 by the City’s, and the City says it “is managed by Ducks Unlimited Canada”. The City’s trail map marks its paths as walking trails (Province page; City page).
The Wildlife Act says “a person may not use land or resources in a wildlife management area without the written permission of the regional manager” (s. 4(4), Wildlife Act), and the Province sends questions about visitor activities to its conservation-lands office. Neither the Province’s page nor the City’s map gives bikes permission, so treat the Fen as a walk.
Bike lanes, sidewalks, highways and bridges
On City streets an e-bike rides as a cycle, in the bike lane where there is one. It may not ride on a sidewalk unless a sign allows it, or on the road portion of Highway 1 or Highway 99 north of 8 Avenue. Across the Fraser, the stal̕əw̓asəm Bridge’s paths are open and the Port Mann’s reads two ways.
Sidewalks
By-law 13007 says a cyclist “shall not ride on a sidewalk unless authorized by this By-law or unless otherwise directed by a traffic control device” (s. 66(2)(a)): $80 paid within 7 days, $105 after. The Motor Vehicle Act says the same for the whole province (s. 183(2)(a)). The City’s data shows 1.14 km of sidewalk as cycling-permitted.
Highways
The Province says “No cycling permitted on Highway 99 from: 1st Avenue in Surrey to the south approach of the Oak Street Bridge”, with the stretch from the “Canada/U.S.A. border to Eighth Avenue (Surrey)” excepted, and bars cycling on Highway 1 from its intersection with Rupert Street to Hope (Province cycling rules; Motor Vehicle Act Regulations s. 19.07, Schedule 1). Inside Surrey that is 13.6 km of Highway 99 and 11.9 km of Highway 1 on our map, read from the City’s road layer.
Bridges over the Fraser
The stal̕əw̓asəm Bridge. The project says “The multi-use paths (MUPs) on the east and west sides of the stal̕əw̓asəm Bridge are open to pedestrians and cyclists”, and the west path lands at King George Boulevard and the Scott Road bike lane (project page).
The Port Mann Bridge. The Province built it with a “5-metre wide multi-user path, with 3 metres of clearance for pedestrians and cyclists” (2011 release), and CBC reported that “On July 1, cyclists and pedestrians were able to begin crossing” in 2015 (CBC).
Yet the provincial regulation still reads, for this bridge, “a person must not operate a bicycle on or within any part of a structure” (B.C. Reg. 513/2004, s. 3(b)), and the Province’s rules page bars riding “on the highway over” it. Read one way, the path is the legal crossing; read strictly, no bike may cross. Ask the Ministry before you rely on it.
Is it an e-bike? B.C.’s test
Every rule here assumes your bike passes B.C.’s test, set in B.C. Reg. 64/2024: electric motors with “a continuous power output rating that, in total, does not exceed 500 W”, assistance that stops at 32 km/h, working pedals, and “only 2 or 3 wheels”. A bike that fails is not an e-bike, and the City’s permission no longer covers it.
The motors “must not be capable of propelling the device at a speed exceeding 32 km/h” and must stop when you stop pedalling, release the throttle or brake (s. 3(2)). A throttle needs a separate switch or must not engage before 3 km/h (s. 3(2)(c)). A gas engine never qualifies: “E-bikes cannot have a combustion engine”, the Province says, and it warns that a device missing any requirement may be illegal on public roads or may need a licence, registration and insurance. It sets two classes (Province e-bike page):
| Standard e-bike | Light e-bike | |
|---|---|---|
| Minimum rider age | 16 | 14 |
| Maximum motor-assisted speed | 32 km/h | 25 km/h |
| Maximum continuous power | 500 W | 250 W |
| Throttle | Yes | No |
Riders of every age wear a bicycle helmet on public roads, unless exempt; the Province’s fine for riding without one is $29. More on the provincial rules, passengers and the classes is in our B.C. e-bike laws guide.
Riding to school adds one more rulebook. Surrey Schools’ 2026-27 letter to parents reminds families that a student must be at least 14 to ride a light e-bike and 16 to ride a standard one, and says “Surrey Schools expects students to dismount e-bikes when on school property at all times and e-bikes may not be charged at school or stored inside school buildings” (Surrey Schools).
SkyTrain, buses and rentals
The Expo Line takes e-bikes, two per car, except in the peak direction at rush hour. TransLink’s bus rules say both that an e-bike under 25 kg may ride the front rack with its battery removed and that motor-assisted bikes are not permitted. Surrey’s e-bike share pilot has ended. Measure and weigh your bike before you plan around transit.
TransLink’s rules for bikes on the Expo Line, from its Bikes on Transit page:
- Bikes ride at all times “except westbound trains during weekday rush hours of 7 a.m. to 9 a.m. and eastbound trains from 4 p.m. to 6 p.m.”
- “Bikes must be less than 185 cm (73 in) long”, and “Bikes are not allowed on escalators”: use the elevators or stairs.
- For a folding bike the table reads “Yes, two bikes per car. No restrictions when folded.” It does not say whether that covers a folding e-bike, so ask TransLink before you plan a rush-hour trip on one.
- TransLink allows no “motorbike-style e-bikes (electric, or gas-powered)” on any transit vehicle.
On buses its table reads “Bus: Yes, on the bike rack with battery removed”, and its rack rules ask that an e-bike “Weigh less than 25 kg (55 lbs)”, yet the same panel also says “Motor-assisted bikes are not permitted.” The page contradicts itself, so ask TransLink before you count on a bus rack. Of our 19 picks, none with a printed weight is under 25 kg.
To leave the bike at the station, TransLink lists a bike parkade for day storage at King George Station and rentable bike lockers at Scott Road and Surrey Central stations and the South Surrey Park & Ride (TransLink bike parking). A locker rents for $10 a month plus GST, with a $50 refundable key deposit and a three-month minimum, and bikes, e-bikes and cargo bikes may go inside. The free racks outside every SkyTrain station are used “at your own risk”, TransLink says.
Bird’s e-bike share ran in North Surrey from 25 April 2024; the City says “The pilot was concluded on October 31, 2025” (City climate action tracker). Shops that sell and service e-bikes in Surrey are in our Surrey e-bike shop directory, and the bridges and SeaBus into Vancouver are in our Vancouver e-bike laws guide.
19 e-bikes for Surrey’s trails, grouped by the ride they suit
These 19 are e-bikes we sell whose makers list a motor rated 500 W or less and a top speed of 32 km/h or less (20 mph where the maker prints miles). We re-read each maker’s Canadian page on 25 November 2026; Samebike has removed the C05 Pro’s (see its card). No page we read offers an unlockable mode.
In the owner’s manuals we read, 11 of the 19 have a speed setting the owner can change. Each of those cards says so and links the manual. In B.C. the bike must stay at 32 km/h or less to be an e-bike, so leave the setting there.
DWMEIGI lists its Zeus trike at 20 mph, which is 32.2 km/h. Weights are in kilograms and speeds in km/h; where a maker prints pounds or miles, its own figure stays in the label. On delivery, check that the motor stops when you brake.
For the paved greenways and bike lanes
Three full-size commuters for the BC Parkway, the Green Timbers Greenway and the City’s protected bike lanes.
Addmotor CityPro E-43
$1,399 CAD
A 26-inch commuter on 2.3-inch tires for the paved greenways and bike lanes, from the BC Parkway to the Green Timbers Greenway. Addmotor Canada’s page prints two batteries, 48V*15Ah in its spec table and a “48V*20Ah UL-certified Battery” in another line, so confirm the one you are buying. Throttle: Half-twist throttle. Specs from Addmotor’s Canadian page, read 25 November 2026.
B.C. check: Addmotor Canada lists a 500 W motor (907 W peak) and 32 km/h; B.C.’s 500 W limit applies to the continuous rating (s. 3(1)), not the peak.
Samebike RS-A01 Pro-T
$1,199 CAD
A full-size step-through for daily riding on the paved greenways and bike lanes, at the lowest price in this group. Throttle: Samebike Canada quotes a “pure electric” range, meaning the motor moves it without pedalling. Specs from Samebike’s Canadian page, read 25 November 2026.
B.C. check: Samebike Canada prints 350 W in its specifications and 500 W in its description, and 32 km/h: both motor figures are inside B.C.’s 500 W limit. The owner can change the speed setting (Samebike’s RS-A01 Pro-T manual), so keep it at 32 km/h or less in B.C. Its Canadian page also shows a video thumbnail printing “40 Km/h”.
Taubik Vista 26
$2,399 CAD
A low step-through on 1.9-inch tires for long paved greenways such as Bose and Clover Valley. Throttle: Thumb throttle, in Taubik’s manual and brochure. Specs from Taubik’s Canadian page, read 25 November 2026.
B.C. check: Taubik lists 500 W and 32 km/h. The owner can change the speed setting (Taubik’s Vista manual), so keep it at 32 km/h or less in B.C.
For gravel greenways, dykes and park paths open to bikes
Wider tires, and on several of these suspension, for the gravel stretches of the greenways, the Mud Bay Dyke Trail and park paths built for bikes.
Taubik Westridge 29T
$2,999 CAD
The widest standard tires in this group (2.4-inch) and a front suspension fork for gravel greenways and dykes open to bikes. It has a mountain-bike frame, but we do not sell it as a bike-park bike: the City has not written an e-bike rule for its bike parks. Throttle: Thumb throttle, in Taubik’s manual and brochure. Specs from Taubik’s Canadian page, read 25 November 2026.
B.C. check: Taubik lists 500 W and 32 km/h, and its manual says “The maximum speed of this E-Bike is 32 km/h.”
Taubik Blackburn 275T
from $2,799 CAD
27.5-inch wheels on 2.35-inch tires for the gravel greenway stretches open to bikes. Throttle: Thumb throttle, in Taubik’s manual and brochure. Specs from Taubik’s Canadian page, read 25 November 2026.
B.C. check: Taubik lists 500 W and 32 km/h.
Taubik Tour S
$2,899 CAD
Full-size 26-inch fat tires and a Bafang motor rated 80 N·m for long days on gravel greenways and dyke trails. Throttle: Thumb throttle, in Taubik’s manual and brochure. Specs from Taubik’s Canadian page, read 25 November 2026.
B.C. check: Taubik lists 500 W and 32 km/h.
Samebike VOYAGER
$1,699 CAD
Front and rear suspension, 80 N·m of torque and a 150 kg payload on a steel frame, for gravel greenways and dyke trails open to bikes. Throttle: In the handlebar diagram of Samebike’s Voyager XT manual. Specs from Samebike’s Canadian page, read 25 November 2026.
B.C. check: Samebike Canada lists 500 W and 32 km/h.
Samebike RS-A02 Pro
$1,399 CAD
Front and rear suspension on 4-inch tires, and it folds, for gravel paths open to bikes. Throttle: Samebike Canada quotes a “pure electric” range (motor without pedalling). Specs from Samebike’s Canadian page, read 25 November 2026.
B.C. check: Samebike Canada prints 500 W in its spec list and 250 W in a feature line, and 32 km/h: both motor figures are inside B.C.’s 500 W limit. The owner can change the speed setting (Samebike’s RS-A02 Pro manual), so keep it at 32 km/h or less in B.C.
Samebike C05 Pro
$1,399 CAD
A step-through frame on 4-inch tires that also folds, for gravel paths open to bikes. Throttle: On the handlebar diagram in the C05 Pro manual, which lists a pure-electric mode. Specs from Samebike Canada’s page as we read it on 9 November 2026 (since removed).
B.C. check: When we last read Samebike Canada’s page, on 9 November 2026, it printed 350 W in its specifications and 500 W in its description, and 32 km/h: both motor figures are inside B.C.’s 500 W limit. Samebike has since removed the page. The owner can change the speed setting (Samebike’s C05 Pro manual), so keep it at 32 km/h or less in B.C.
Taubik Escape S
$2,599 CAD
A folding fat tire with a 500 W motor, for gravel paths and the trunk of a car. Throttle: Thumb throttle, in Taubik’s manual. Specs from Taubik’s Canadian page, read 25 November 2026.
B.C. check: Taubik lists 500 W and 32 km/h. The owner can change the speed setting (Taubik’s Escape S manual), so keep it at 32 km/h or less in B.C.
Folding bikes for the SkyTrain and the car
TransLink’s table gives a folding bike “No restrictions when folded” on the Expo Line, but lists e-bikes on a row of their own, two per car, and does not say which row a folding e-bike falls under. Until TransLink says, plan on the e-bike row, rush-hour limits included.
Samebike 20LVXD30-II
$1,000 CAD
Folds small for the car or a condo storage room. At 25 kg it is the lightest printed weight on this list, but TransLink’s bus racks take e-bikes that weigh “less than 25 kg”. Throttle: Half-twist throttle, in the handlebar photo on Samebike Canada’s page. Specs from Samebike’s Canadian page, read 25 November 2026.
B.C. check: Samebike Canada lists 350 W and 32 km/h.
Samebike CY20
$1,000 CAD
A folder with front and seat suspension for rough pavement and short gravel links. Throttle: On the handlebar diagram in Samebike Canada’s CY20 manual, which gives a pure-electric range. Specs from Samebike’s Canadian page, read 25 November 2026.
B.C. check: Samebike Canada lists 350 W and 32 km/h. The owner can change the speed setting (Samebike’s CY20 manual), so keep it at 32 km/h or less in B.C.
Samebike CY20 Pro
$999 CAD
Listed at 500 W with a 624 Wh battery, for riders whose trip ends with a climb. Throttle: Thumb throttle, per Samebike Canada’s page. Specs from Samebike’s Canadian page, read 25 November 2026.
B.C. check: Samebike Canada prints 500 W in its specifications, and a video thumbnail on the same page prints “MOTOR 250W”: both motor figures are inside B.C.’s 500 W limit. The owner can change the speed setting (Samebike’s CY20 Pro manual), so keep it at 32 km/h or less in B.C.
Taubik Monaco S
$2,899 CAD
Three-inch tires on a folding frame: grip on gravel without the full width of a 4-inch tire. Throttle: Thumb throttle, in Taubik’s manual. Specs from Taubik’s Canadian page, read 25 November 2026.
B.C. check: Taubik lists 500 W and 32 km/h. The owner can change the speed setting (Taubik’s Monaco S manual), so keep it at 32 km/h or less in B.C.
Trikes
B.C. Reg. 64/2024 s. 4(a) allows “only 2 or 3 wheels”, so a trike that meets the motor and speed limits is an e-bike like any two-wheeler.
Addmotor Citytri E-310
from $1,899 CAD
A trike that folds, rated by Addmotor for 127 kg plus 36 kg of cargo, for errands on the paved greenways. Throttle: Half-twist throttle. Specs from Addmotor’s Canadian page, read 25 November 2026.
B.C. check: Addmotor Canada lists a 500 W rear-drive motor and 32 km/h.
Meet One Breeze 2.0
from $2,599 CAD
Fat tires on a trike, with cruise control and reverse, for long flat greenways and tight parking. Throttle: Riding modes per Meet One: throttle, pedal assist, cruise control, reverse. Specs from Meet One’s Canadian page, read 25 November 2026.
B.C. check: Meet One lists 32 km/h on the Breeze 2.0 page and 500 W in the comparison table on its Breeze Pro 2.0 page. The owner can change the speed setting (Meet One’s Breeze 2.0 display manual), so keep it at 32 km/h or less in B.C.
DWMEIGI Hera
$1,799 CAD
Three wheels and a 24 km/h (15 mph) top speed for an easy pace on paved paths. Throttle: DWMEIGI quotes a range “under pure electric mode”. Specs from DWMEIGI’s Canadian page, read 25 November 2026.
B.C. check: DWMEIGI lists 350 W and a 15 mph (24 km/h) top speed.
DWMEIGI Silverado HD
$3,699 CAD
A fat-tire trike with a 24 km/h (15 mph) top speed for relaxed riding on gravel paths open to bikes. Throttle: DWMEIGI quotes a range “under pure electric mode”. Specs from DWMEIGI’s Canadian page, read 25 November 2026.
B.C. check: DWMEIGI lists 500 W and a 15 mph (24 km/h) top speed. The owner can change the speed setting (DWMEIGI’s MG2301 manual), so keep it at 32 km/h or less in B.C.
DWMEIGI Zeus fat-tire trike
$2,928 CAD
The biggest battery among the DWMEIGI trikes here (48 V 18.2 Ah), for long days on the greenways. Throttle: DWMEIGI quotes a range “(pure electric mode)”. Specs from DWMEIGI’s Canadian page, read 25 November 2026.
B.C. check: DWMEIGI lists 500 W and a 20 mph (about 32 km/h) top speed. The owner can change the speed setting (DWMEIGI’s MG1703 manual), so keep it at 32 km/h or less in B.C.
Not sure which of the 19 fits your ride?
Call 1-866-938-7580 and tell us where you start and how far you go. An unused, unopened bike can be returned within 15 days of delivery, less a 15% restocking fee and return shipping, and you can spread the cost with financing.
Browse Zeus’s e-bike collection →What could change before your next ride
The City’s cycling page says “175 km are planned for long-term delivery over several decades”, and its greenway layer holds 212.6 km of line marked conceptual. Metro Vancouver can settle its two readings with one posted notice, and the Province can update the Port Mann regulation. Check the sign at the entrance before you trust any map, this one included.
The City also lists “BC Parkway improvements - Scott Road Stn to King George Stn” as underway. We will redraw this map from the City’s data when the layers change. Riders on three wheels or folding bikes will find more in our electric trike guide and folding e-bike guide, and the neighbouring maps for Richmond and Abbotsford use the same colours.
Every community, every named greenway
Every community in the City’s boundary layer has paths open to e-bikes; Whalley (38.6 km, City Centre included) and Grandview (37.0 km) have the most. The table counts each path and trail once, by its rule, and leaves out street bike lanes and the two highways.
All but 2.2 km of those paths fall inside the community areas; the exception is the Mud Bay Dyke Trail on the shore. The layer draws City Centre inside Whalley, so its paths count under Whalley. The third column adds the bike-park trails to Metro Vancouver’s trails open to cycling, and the last adds Metro Vancouver’s trails closed to bikes to the trails the City calls unsanctioned.
| Community | Open (km) | Ask first (km) | Bike park or two readings (km) | No (km) |
|---|---|---|---|---|
| Whalley (with City Centre) | 38.6 | 49.9 | 0.1 | 14.8 |
| Grandview | 37.0 | 21.6 | 0.0 | 2.8 |
| Newton | 29.0 | 56.5 | 0.4 | 0.8 |
| Clayton | 22.3 | 13.2 | 0.0 | 0.0 |
| South Surrey | 21.9 | 59.9 | 6.9 | 1.1 |
| Guildford | 19.4 | 28.9 | 12.1 | 12.3 |
| Cloverdale | 15.7 | 17.1 | 0.3 | 3.2 |
| Fleetwood | 11.9 | 20.8 | 0.0 | 0.6 |
The longest named greenways and trails on the City’s open network, measured on our map. We count only the lines the City’s greenway layer marks in service, so a route can measure shorter here than on the City’s page: the layer marks 5.8 km of the Bose Greenway in service and 4.5 km more as conceptual, against the page’s 8 km.
| Greenway | Open on our map (km) |
|---|---|
| Green Timbers Greenway | 15.6 |
| Fraser Greenway | 8.3 |
| Newton Greenway | 6.1 |
| Bose Greenway | 5.8 |
| Latimer Greenway | 5.5 |
| Nicomekl Greenway | 5.4 |
| Hawthorne Greenway | 5.3 |
| Cloverdale Greenway | 5.0 |
| Coast Meridian Greenway | 4.9 |
| Semiahmoo Trail | 4.9 |
| Surrey Lake Greenway | 4.4 |
| BC Parkway | 4.3 |
| Clover Valley Greenway | 3.6 |
| Fraser Heights Greenway | 3.6 |
| Pioneer Greenway | 3.5 |
| Rosemary Greenway | 3.5 |
| Bon Accord Greenway | 3.5 |
| Scott Greenway | 3.0 |
| Bear Creek Greenway | 3.0 |
| Sunnyside Greenway | 2.9 |
| Oliver Greenway | 2.6 |
| Katzie Greenway | 2.6 |
| Grandview Heights Greenway | 2.5 |
| Riverside Greenway | 2.4 |
| Johnston Greenway | 2.4 |
| Port Mann Greenway | 2.2 |
| Mud Bay Dyke Trail | 2.2 |
| Douglas Greenway | 2.1 |
| Fleetwood Greenway | 2.1 |
Frequently asked questions
Are e-bikes legal in Surrey, BC?
Yes. Surrey’s Highway and Traffic By-law 13007 (s. 1, “cycle”) counts a motor-assisted cycle as a cycle, and the City says “E-bikes are permitted on roads, designated bike lanes, and multi-use pathways across Surrey.” The bike must pass B.C.’s test in B.C. Reg. 64/2024, s. 3: 500 W or less in total, assistance that stops at 32 km/h, working pedals. By our count that opens 198 km of multi-use path and greenway.
Are e-bikes banned in Surrey?
No. Surrey bans e-scooters, not e-bikes, from public property. An e-bike is barred from sidewalks unless a sign allows cycling, from park paths not built for bikes or signed against them, from the sensitive area at Blackie Spit, from Metro Vancouver trails closed to cycling, and from Highway 1 and Highway 99 north of 8 Avenue.
What are Surrey’s e-bike rules?
Ride a bike that passes B.C.’s test, be 16 or older (14 for a light e-bike), wear a helmet, use roads, bike lanes and multi-use paths, and stay off sidewalks unless a sign allows cycling (By-law 13007, s. 66(2)(a): $80 within 7 days, $105 after). Inside City parks the limit is 15 km/h for every vehicle, bicycles included (By-law 13480, s. 69). At school, Surrey Schools expects students to dismount e-bikes on school property.
Is there a Surrey bike trail map?
Yes. The City publishes a bike map of its routes and its open data, and the map on this page colours each trail in the City’s open data and Metro Vancouver’s Surrey parks by its rule: green open, grey ask first, amber two readings, red no. Tap it to search a trail or find where you are.
What are the best bike trails in Surrey?
Start with the long greenways the City has finished: the Green Timbers Greenway (16 km by the City’s count), the BC Parkway, the Bose Greenway (8 km), the Fraser Heights Greenway (5 km) into Tynehead, and the Mud Bay Dyke Trail toward Boundary Bay.
How long is the Tynehead Perimeter Trail?
Metro Vancouver says the east section is approximately 5 km of paved trail and the west section is gravel and approximately 1 km. It is the only trail in Tynehead where cycling is allowed. For e-bikes, Metro Vancouver’s Bylaw 1420 (s. 29(f)) and its 2025 staff report read two ways, so read the trailhead sign.
Can you bike the Surrey Bend Regional Park trails?
Yes, except on the pedestrian-only section of Parsons Trail, Metro Vancouver says, and its page lists 5.3 km of cycling trails. E-bikes fall under the same two readings as Tynehead.
Where is the Mud Bay dyke trail?
It runs from Mud Bay Park in South Surrey along the shore of Mud Bay; the City says you can continue “to follow 20 kilometres of shoreline all the way to Boundary Bay Regional Park in Delta.” The Surrey part is a City greenway open to e-bikes; the Boundary Bay part is a Metro Vancouver park with two readings.
How long is the Semiahmoo Trail?
Our map measures 4.9 km of the Semiahmoo Trail as open multi-use path or greenway. The City calls it “one of the first roads in Surrey” and says the trail “is made up of a combination of nature trails, paved paths and roads”, so ride the paved paths and roads and treat its nature trails as ask-first. The City names “the corner of 148 Street and 28 Avenue” as an easy start and notes “there is no formal parking lot for Semiahmoo Trail.”
What is the Delta-South Surrey Regional Greenway?
A Metro Vancouver regional greenway of 6.6 km that is open to hiking, horseback riding and cycling, with connections to the Boundary Bay Dyke Trail, Joe Brown Park and Watershed Park. E-bikes read two ways under Metro Vancouver’s Bylaw 1420, s. 29(f). Metro Vancouver’s brochure warns that “trail surface conditions may be affected by intermittent flooding” and asks cyclists to walk their bikes on the pedestrian-only boardwalks of the Delta Nature Reserve.
Can you bike at Serpentine Fen?
Treat it as a walk. The Fen is a provincial wildlife management area, the City’s trail map shows walking trails, and the Wildlife Act (s. 4(4)) requires the regional manager’s written permission to use land in one. The Province answers questions about visitor activities at its conservation-lands office.
Is there a bike park in Surrey?
Yes, several. The City lists bike parks from the South Surrey Bike Park, its first official one, to Invergarry, a downhill park with expert terrain. The pages we read say nothing about e-bikes, and By-law 13480 treats an e-bike like any bicycle, so follow the sign at the gate.
Are e-scooters legal in Surrey?
Not on public property. The City says “E-scooters are not permitted on public property”: not on a public road, a public sidewalk or in a park, citing By-law 13480 for parks. They are allowed on private property.
Can I rent an e-bike in Surrey?
Not from a City share program: Bird’s e-bike share pilot in North Surrey started on 25 April 2024 and, the City says, “The pilot was concluded on October 31, 2025.”
Where can I park my bike at a Surrey SkyTrain station?
TransLink lists a bike parkade at King George Station and monthly bike lockers at Scott Road and Surrey Central stations and the South Surrey Park & Ride: $10 a month plus GST, a $50 refundable key deposit and a three-month minimum, with e-bikes allowed inside. Free racks stand outside every SkyTrain station, used “at your own risk”, TransLink says.
Before your first ride
Check three things and most of Surrey’s greenways are yours: the bike passes B.C.’s test, you are 16 or older with a helmet, and you stay off sidewalks. Then pick the ride: the paved greenways for a commuter, the gravel and the dyke for wide tires, and the SkyTrain for a folder you can carry.
Zeus ships free across Canada, from Canada. An unused, unopened bike can be returned within 15 days of delivery, less a 15% restocking fee and return shipping. Call 1-866-938-7580 to talk it through with a person, or read the financing guide first.
References
Every source below was read on 25 November 2026. Bike specifications are from each maker’s Canadian page, linked on its card, and prices are from our own store on the same date. Map data: Contains information licensed under the Open Government Licence – City of Surrey; Metro Vancouver Regional Parks Boundaries (Open Data); © OpenStreetMap contributors (ODbL).
- City of Surrey, Cycling (e-bikes, greenways, the 2026 vision)
- City of Surrey, Bike map (PDF)
- City of Surrey, Greenways Master Plan
- City of Surrey, Corporate Report R129 (2012), Greenways Plan
- City of Surrey, Corporate Report R007 (12 January 2026), Long-Term Cycling Vision
- City of Surrey, Parks, Recreation and Cultural Facilities Regulation By-law No. 13480 (consolidated)
- City of Surrey, Highway and Traffic By-law No. 13007 (consolidated to 13 April 2026)
- City of Surrey, E-scooters
- City of Surrey, Bike Parks
- City of Surrey, Invergarry Park
- City of Surrey, South Surrey Athletic Park
- City of Surrey, Green Timbers Urban Forest Park
- City of Surrey, Sunnyside Acres Urban Forest Park
- City of Surrey, Redwood Park
- City of Surrey, Mud Bay Park
- City of Surrey, Semiahmoo Trail Park
- City of Surrey, Blackie Spit Park
- City of Surrey, Serpentine Wildlife Management Area
- City of Surrey, Climate Action Tracker T5.1 (e-bike share)
- City of Surrey, Open Data
- Metro Vancouver, Tynehead Regional Park
- Metro Vancouver, Surrey Bend Regional Park
- Metro Vancouver, Delta-South Surrey Regional Greenway
- Metro Vancouver, Delta-South Surrey Regional Greenway brochure (PDF)
- Metro Vancouver, Boundary Bay Regional Park
- Metro Vancouver, Bylaw 1420 (consolidated to 1 January 2026)
- Metro Vancouver, Regional Parks Committee agenda, 2 April 2025
- B.C. Reg. 64/2024, Motor Assisted Cycle (E-Bike) Regulation
- Motor Vehicle Act, Part 3 (ss. 182.1–184)
- Motor Vehicle Act Regulations, s. 19.07 and Schedule 1
- B.C. Reg. 513/2004, Provincial Public Undertakings Regulation
- Wildlife Act, s. 4
- Province of B.C., Bike and e-bike rules and safety
- Province of B.C., E-bike requirements
- Province of B.C., Serpentine Wildlife Management Area
- Province of B.C., news release 2011PREM0099-001056 (Port Mann)
- CBC News, Port Mann Bridge construction officially over (2015)
- Pattullo Bridge Replacement Project, Active transportation
- TransLink, Bikes on Transit
- TransLink, Bike Parking
- Surrey Schools, E-bikes and e-scooters on school property, letter to parents 2026-27 (PDF)
- Meet One, Breeze Pro 2.0 page (comparison table)







Share:
Calgary Bike Trail Map for e-Bikes (2026): 1,272 km, Rule by Rule
Vancouver Island Bike Trails Map for e-Bikes (2026): 479 km